Notice
Following a review of the Buildings at Risk Register we have paused the Register while we consider options for its future.
The website will remain accessible and searchable during this time, but it will not be updated and we’re not accepting nominations for additions to the Register. If you need to contact us about the BARR please email hmenquiries@hes.scot
Read the review report here and you can find out more about why we have paused the BARR on our news centre.
Scheduled Maintenance Notice
Please be advised that this website will undergo scheduled maintenance starting on Thursday, 30th January at 11:00 AM and will last until Friday, 31st January at 10:00 AM.
During this time, the site and certain functions may be partially or fully unavailable. We apologise for any inconvenience this may cause.
Gartnavel Royal Hospital: East House, Great Western Road, Kelvinside
Useful Links
- Canmore:
- GLASGOW, 1055 GREAT WESTERN ROAD, GARTNAVEL ROYAL HOSPITAL
- Historic Scotland:
- HS Reference No 32318
General Details and Location
Description
East wing: 21 bays arranged with 3-bay 3-storey end pavilions and 5-bay 3-storey central pavilions. Details as above except hood-moulds only to ground floor and label stops of doorpiece simple blocks. S flank with 2 small ogee-domed pavilions linking tall coursed rubble garden wall to S, (airing ground). INTERIOR: with large dormitories, few smaller rooms off. (Historic Scotland)
Gartnavel Royal was built to replace William Stark's 1809 asylum, which had been steadily expanding since its construction in Parliamentary Road. A new site was acquired in 1839 with Charles Wilson appointed as architect. The new asylum was originally designed in two sections to be connected by a chapel and offices, these however were not constructed and it wasn't until 1904-6 that a chapel was built when Sir JJ Burnet was employed to provide new plans. (H.Richardson/ Historic Scotland)
Category of Risk and Development History
The complex of buildings have been extensively damaged by vegetation growth in walls and roofs. There has been extensive theft of lead gutters and flashings, into which vegetation has widely established. Some roof pitches have collapsed. There has been extensive interior damage and destabilisation of parapet masonry. A scheme of stabilisation works has been prepared and proposes the downtaking and storing parts of the parapet masonry for later reinstatement, removal of vegetation, removal of collapsed material and installation of steel bracing to external walls around the main entrance. NHS Greater Glasgow & Clyde estates team confirm initial works are already underway. Condition moved to Very Poor as parts of the complex are roofless, Risk moved to Moderate as stabilisation works are underway and will be undertaken on a phased basis.